The full anatomy
of a TERMICOIL® network.
A walkthrough of every stage — from pipe routing in the raft to the very last refill, decades later. Engineered to match your foundation drawings, BoQ-ready, and certified end-to-end.
Four steps. A lifetime of defence.
A pre-construction installation that becomes invisible the moment your slab is poured — and stays serviceable for the building's lifetime.
Pipe network laid
Perforated HDPE pipes are laid in a grid along the building perimeter and beneath the slab, before concrete is poured.

"I love pre-slab stage — that's when I move in."
Nozzles connected
Discharge nozzles are surfaced at strategic refill points. Each connects to a sealed, weather-proof manifold.

"Pop the cap, top me up. That's it."
Termiticide charged
Approved termiticide is pumped through the network, soaking the soil column. A chemical moat surrounds your foundation.

"Now I'm armed. Termites turn back at the boundary."
Protected for life
Every 5–7 years, refill through the same nozzles. Zero drilling, zero floor damage, lifelong defence.

"Installed once. I never retire."