Installation stories from the field.

How certified TCS crews install TERMICOIL® under villas, towers, hospitals and warehouses across India. (Representative case studies — project names anonymised.)

Residential

Skyline Heights — 4-tower residential township

Ahmedabad, Gujarat 18,400 m of TC-16-500 across raft foundations 11 days, 4 install crews

Coordinated with the RCC contractor to lay the reticulation grid across four tower rafts before each pour. Refill chambers positioned in stilt-level utility shafts for lifetime access.

OutcomeZero termite activity across all periodic inspections since handover.
Residential

Greenfield Villa — premium independent bungalow

Surat, Gujarat 640 m of TC-12-100 under plinth & aprons 1 day, single crew

Full perimeter and floor-bed grid installed in a single working day, including garden-facing apron loops — the most common termite entry path for villas.

OutcomeOwner opted for the annual refill programme with the certified TCS agency.
Commercial

Textile logistics warehouse — 1.2 lakh sq ft

Bhiwandi, Maharashtra 9,600 m of TC-16-500 under VDF flooring 6 days, phased with PEB erection

High rack-load VDF floors make post-construction drilling impossible. The TCS grid was zoned into eight independently rechargeable sectors to match the racking layout.

OutcomeInsurer accepted the TCS certificate towards stored-goods risk compliance.
Commercial

Multi-speciality hospital block

Rajkot, Gujarat 4,100 m of TC-16-200 with isolated OT zone loops 4 days

Hospitals cannot tolerate drill-and-inject retreatment. Dedicated loops around records rooms and OT complexes allow chemical recharge with zero disruption to operations.

OutcomeSpecified by the consulting architect on two follow-on hospital projects.
Residential

Heritage haveli restoration

Jaipur, Rajasthan 820 m perimeter reticulation, retrofit trenching 3 days

A 140-year-old timber-rich structure demanded non-invasive protection. Shallow perimeter trenches carried the coil around original foundations without touching heritage fabric.

OutcomeActive infestation eliminated after two charge cycles; structure now on annual refill.
Commercial

Auto-component plant, GIDC estate

Sanand, Gujarat 6,800 m of TC-16-500 under production bays 5 days, integrated with tender spec

A GGRC-conformant installation executed to government tender specification, with documented emitter spacing and post-charge pressure logs submitted for approval.

OutcomePassed third-party tender audit on first inspection.